Skip to main content

S/Y SPIP 27 m

Period of work

September – October 2007

Scope of main works

  • Paint works
  • New antifouling
  • Teak deck repair
  • Rig check
  • Woodworks on furnitures
  • Logistic assistance to the crew

Top