Skip to main content

M/Y WISTING 32 m

Period of work

2009 (3 months)

Scope of main works

  • Topsides anticorrosion treatment and repaint under climate-controlled cover
  • Main deck inner bulwark local anticorrosion treatment and repaint
  • Main deck inner walls cleaning and local repaint
  • Anchor pockets and hull protection modification
  • Main engine exhaust outlets modification
  • Underwater repaint with local sandblasting and raising 30 cm the waterline

Top