Skip to main content

M/Y “X” 56 m

Period of work

2010-2011 (6 months)

Scope of main works

M/Y “X” 56 m spend 6 months at Atlantic Refit Center during winter 2010-2011 for refit works. On time and on budget. Captain and crew were delighted for the time they spend in La Rochelle.

  • Topsides anticorrosion treatment and repaint under climate-controlled cover

Top